Request a call

The contact person
Phone
Homepage Projects Copper-concentrating Factory

Copper-concentrating
Factory

Performed works
  • Designing a DAC.
  • Installation of GPA-8 NC / VAC (2 pcs.) for I
  • Installation of GPA-18 NC / V DKS (2 pcs.) for II
  • Installing the compression system.
  • Installing a fuel preparation system
  • Installing a gas cleaning system
  • Installing a pulsed air preparation system
  • Installing heat supply systems
  • Installing the ADSL DAC system
  • Installing the process gas metering nodes.
  • Supply of pipeline fittings
  • Installing cabling and wiring products
Previous project
Copper Smelting Plant
The next project
Mining and Metallurgical ...

Address:

100201, Tashkent city, Mirzo-Ulugbek district, A. Yuknakiy massif, Ul. G-40, house-38

Request a call